J A Stevenson donate Non-Slip to Historic Site

October 8th, 2012 | Anti slip,News |

J A Stevenson have donated £25,000 worth of Non-Slip flooring to one of Europe’s most famous historic battle sites.

J A Stevenson have donated £25,000 worth of Non-Slip flooring to build a safe walkway around the Lochnagar Crater in France.

Adrian Stevenson said “This site is a major part of British history and attracts thousands of visitors a year. We are pleased to be able to help with this project and will be donating the materials which would normally cost £25,000 free of charge. Once the work is completed we will know those visitors will be safe.”

Please click here to read the article from the Shropshire Star Newspaper

Wembley Stadium’s Dual-Height Handrails

April 18th, 2012 | Anti slip,News |

J A Stevenson were awarded the contract to aid with DDA Compliance on the new Wembley Stadium, and ensure all handrails were warm-to-touch.

We completed the job to a high standard and the dual-height handrails have helped to ensure that the stadium complies with all points of the Disability Discrimination Act.

The job was completed on time and to a high standard.
Wembley 013

Wembley 003

Anti Slip Railway Bridge with DDA Compliant Handrails

March 5th, 2012 | Anti slip,News |

J A Stevenson were awarded the contract to make help make Pewsey Railway Station footbridge DDA Compliant, including manufacture and installation of dual height, warm to touch handrails and anti-slip flooring for pedestrian use.

New warm to touch handrail were designed fabricated shot blasted and coated all in house and fitted by our own on site team in a number of days, ensuring that minimal disruption to the use of the bridge.

The anti slip surfaces and tactile flooring were all bespoke manufactured to meet with the rail specifications.

Works were completed within one week.

To see a larger version of the pictures, please click on them.

IMG_0369 (1)

DDA Compliant Stairs and Warm-to-Touch Handrails

February 27th, 2012 | Anti slip,News |
J A Stevenson Ltd were contracted to make Warminster Railway Station Footbridge DDA Compliant. Anti-Slip Stair Treads with full height riser were bespoke manufactured together with landing areas with tactile and nosings incorporated into the sheet.
The overhead bridge had a complete new overdeck floor made up of 6mm thick light-commercial use suregrp anti slip sheets which were also bespoke manufactured. Tactiles were manufactured and fitted to the top and bottom of each stairs.
Old handrails were removed and a new DDA compliant warm to touch double handrail system was designed, manufactured and installed.
The project was scheduled to last two weeks but was completed within the first, with minimal disruption to the station

Temporary Tactile and Anti-Slip Platform Surface

January 5th, 2012 | Anti slip,News |

J A Stevenson Ltd were asked to manufacture 260 linear meters of temporary SureGRP Anti Slip Sheets with tactiles and all sight lines and nosings incorporated into the sheets with a curvature profile to follow the railway lines.

The project from start to finish was only 18 days the project was successfully completed on time.

Please click on the pictures to see a larger version.

Anti slip, DDA Compliant Solutions for Rail

March 7th, 2011 | Anti slip,Modular Platforms,News |

croydon-009_0We have the space in our factory to pre-assemble modular platforms using steel powder coated balustrading and handrails to DDA regulations, we apply our suregrp anti slip product to provide a complete solution.  Or we can provide each element or a combination thereof.  We are UK wide and have supplied our products worldwide.

Modular Platform Design, Build and Install

March 7th, 2011 | Modular Platforms,News | No Comments »

croydon-012We offer demountable temporary platforms for train, tram or general raised access applications.  The platforms are of interlocking modular construction, with a substantial steel subframe and adjustable feet.

Our modular platform surface is 12mm thick Suregrp material with tactile inserts as required for the duty.  Fully DDA compliant ramped access, handrails throughout and barrier fencing complete the package.

We pre-assemble the modular platform in our factory before it is moved to site to ensure perfect fit and quick assembly on site without snags or problems, avoiding loss of service for end-users.